Integration of the micro hydroelectric generator in the GEDERlab. During the month of December, the hydraulic installation of the upper and lower tanks, as well as the turbines and pumps, was carried out. This will allow tests to be carried out in the coming months that include this water resource.
There is a storage of 500 L in the upper tank and 500 L in the lower tank to simulate a closed water cycle. There are two turbines of 1.50kW each and two pumps of 0.60kW each. 3kW of turbining and 1.2kW of pumping are available.
On the other hand, work is being done on the development of an optimization system for renewable plants in the "Resource Allocation" application.